Live Quiz Arena
🎁 1 Free Round Daily
⚡ Enter ArenaQuestion
← HistoryWhich consequence results when mortar mixing error occurs in Inca ashlar masonry?
A)Progressive joint gap widening✓
B)Accelerated lichen colonization begins
C)Terrace surface waterlogging starts
D)Diminished quipu data integrity
💡 Explanation
Progressive joint gap widening occurs because poor mortar mixing causes decreased cohesive strength within the masonry structures via joint degradation. Therefore, joints degrade, rather than remaining sealed, because the adhesive forces give way given the imperfect interface mix.
🏆 Up to £1,000 monthly prize pool
Ready for the live challenge? Join the next global round now.
*Terms apply. Skill-based competition.
Related Questions
Browse History →- Within the elevated aqueducts associated with Aztec chinampa agriculture, which risk increased sharply if water flowrate exceeded capacity?
- Which outcome reduces fired brick compressive strength when medieval kilns lack temperature regulation?
- Which structural risk was amplified when 18th-century ships exceeded displacement limits?
- Which destabilizing outcome accelerated erosion after Inca abandonment of their terracing systems?
- Which navigational outcome was critically improved by the invention of the marine chronometer?
- Which outcome resulted when astrolabe engravings deviated irregularly?
