Live Quiz Arena
🎁 1 Free Round Daily
⚡ Enter ArenaQuestion
← TechnologyWhich disruption occurs with excessive PLC scan time?
A)Uncontrolled robotic arm oscillations✓
B)Increased sensor data accuracy
C)Faster data logging frequency
D)Improved servo motor responsiveness
💡 Explanation
Increased PLC program execution (scan) time leads to missed encoder pulses and timing inaccuracies in control loops; this results in under-damped robotic arm movements via the computed inverse kinematics because positional corrections update irregularly at extended period intervals, therefore oscillations occur rather than precise, smooth motions.
🏆 Up to £1,000 monthly prize pool
Ready for the live challenge? Join the next global round now.
*Terms apply. Skill-based competition.
Related Questions
Browse Technology →- Which outcome occurs when turbine blade icing causes asymmetric drag in a multi-engine turboprop aircraft?
- Which outcome is most likely in a diesel engine when fuel cetane number is significantly below specification?
- Which outcome occurs when fast-switching solenoid valve actuation causes hydraulic resonance?
- Which outcome occurs when lubricating oil thins excessively between piston and cylinder wall under high thermal load conditions?
- Which risk increases when small cracks initiate at crankshaft fillets in high-performance engines?
- Which risk escalates when stiction arises in aircraft's hydraulic servo-valves?
