Live Quiz Arena
🎁 1 Free Round Daily
⚡ Enter ArenaQuestion
← GeographyWhich outcome is accelerated when levee construction reduces floodplain extent?
A)Increased channel bed sediment scour✓
B)Decreased regional groundwater recharge
C)Downstream floodplain nutrient deposition
D)Upstream reduction in stream gradient
💡 Explanation
Increased channel bed sediment scour accelerates because the confinement increases flow velocity, therefore sediment transport capacity rises well above the stream equilibrium, rather than deposition on distant areas.
🏆 Up to £1,000 monthly prize pool
Ready for the live challenge? Join the next global round now.
*Terms apply. Skill-based competition.
Related Questions
Browse Geography →- Which outcome increases on coastlines with abundant stacks?
- Which outcome arises when significant bioturbation hinders pedogenesis?
- After rapid tephra deposition from Plinian eruptions, which outcome diminishes slope erodibility?
- Which outcome occurs when heavy pyroclastic flows enter lakes?
- Which mechanism causes anomalously high tsunami run-up following a megathrust earthquake?
- Which mechanism dictates soil-horizon development during glacial retreat?
