← HistoryWhich outcome resulted from ice accumulation on the bridge cables due to freezing rain on the Quebec Bridge's under-construction cantilever spans?
A)Increased torsional stress in cables
B)Reduced tensile strength of supports
C)A shift in structural balance✓
D)Elevated resonant frequency onset
💡 Explanation
A shift in structural balance resulted due to increased dead load. Icing increases weight through the 'accumulation' mechanism, unbalancing the incomplete cantilever. This imbalance led to structural instability, rather than only heightened stress because even distribution was necessary.
🏆 Up to £1,000 monthly prize pool
Ready for the live challenge? Join the next global round now.
*Terms apply. Skill-based competition.
Related Questions
Browse History →- Which limitation constrains astrolabe accuracy when sighting celestial objects located near to the horizon?
- Which defense emerged within medieval fortifications due to the undermining risk of surrounding stone walls?
- Which structural failure mode became a critical limitation for Roman ballista effectiveness with increased bowstring tension?
- Which risk increases when bronze tools used to cut limestone blocks exhibit high tin content?
- Which mechanism limited the construction height of Gothic cathedrals before introduction of iron reinforcements?
- During China's Warring States period, which consequence resulted when iron plows encountered heavily compacted soil?