Live Quiz Arena
🎁 1 Free Round Daily
⚡ Enter ArenaQuestion
← TechnologyWhich risk increases when a hydroelectric generator's over-speed protection fails during a penstock blockage?
A)Runaway speed and turbine explosion✓
B)Increased stator winding insulation breakdown
C)Resonance in the transformer core
D)Harmonic distortion from load imbalancees
💡 Explanation
The risk of runaway speed increases massively because without the over-speed protection activating the mechanical circuit breaker, the turbine accelerates unchecked due to the water flow, therefore exploding mechanically, rather than controlling the rotational speed.
🏆 Up to £1,000 monthly prize pool
Ready for the live challenge? Join the next global round now.
*Terms apply. Skill-based competition.
Related Questions
Browse Technology →- Which outcome occurs when the inductive reactance dominates in a power transformer's secondary circuit?
- Which outcome occurs in a pneumatic actuator when supply pressure exceeds the actuator's design limits?
- Which outcome occurs when desiccant filter drier saturates in an HVAC refrigerant loop?
- Which risk increases in an underwater acoustic transducer experiencing prolonged high-intensity sound projection near the cavitation threshold?
- Which mechanism causes signal degradation in optical fibers operating near 1550 nm?
- Which pitot-static system failure causes inaccurate airspeed during descent?
