VibraXX
Live Quiz Arena
🎁 1 Free Round Daily
⚡ Enter Arena
HomeCategoriesTechnologyQuestion
Question
Technology

Which risk increases when improperly calibrated tensioning equipment stresses a pre-stressed concrete beam beyond designed limits?

A)Sudden brittle tendon rupture
B)Increased long-term creep deformation
C)Accelerated corrosion within the concrete
D)Reduced shear capacity at beam ends

💡 Explanation

When excessive tension stresses a beam beyond its yield point, brittle failure of the prestressing tendons can occur because the steel's strain hardening capacity is exceeded without sufficient warning. Therefore, tendon rupture results, rather than gradual creep, accelerated corrosion, or reduced shear, which involve distinct degradation mechanisms.

🏆 Up to £1,000 monthly prize pool

Ready for the live challenge? Join the next global round now.
*Terms apply. Skill-based competition.

⚡ Enter Arena

Related Questions

Browse Technology