Which risk increases when post-tensioned concrete beam over-tightening occurs during cable tensioning procedure?

A)Reduced shear strength from cracking
B)Increased creep deflection long-term
C)Accelerated rebar corrosion initiation
D)Reduced fire resistance from spalling

💡 Explanation

When concrete beams are over-tensioned cracking occurs around anchorages because exceeding design stress limit induces local tensile stresses, leading to micro-cracks and reduced effective shear area. Therefore reduced shear strength results, rather than excess deflection, corrosion, or fire resistance decrease which depend on different degradation mechanisms.