Live Quiz Arena
🎁 1 Free Round Daily
⚡ Enter ArenaQuestion
← TechnologyWhich risk increases when post-tensioned concrete beam over-tightening occurs during cable tensioning procedure?
A)Reduced shear strength from cracking✓
B)Increased creep deflection long-term
C)Accelerated rebar corrosion initiation
D)Reduced fire resistance from spalling
💡 Explanation
When concrete beams are over-tensioned cracking occurs around anchorages because exceeding design stress limit induces local tensile stresses, leading to micro-cracks and reduced effective shear area. Therefore reduced shear strength results, rather than excess deflection, corrosion, or fire resistance decrease which depend on different degradation mechanisms.
🏆 Up to £1,000 monthly prize pool
Ready for the live challenge? Join the next global round now.
*Terms apply. Skill-based competition.
Related Questions
Browse Technology →- Which consequence results when fatigue cracking initiates at a weld in a steel beam supporting a high-cycle industrial crane?
- Which risk markedly increases when forging dies exceed erosion tolerance?
- After forging of turbine blades, which consequence results when residual stress gradient concentrates near the blade's edge?
- Which disruptive outcome arises under arcing fault condition in electrical power distribution systems?
- Which modulation outcome occurs when clipping a 64-QAM RF signal?
- Which risk increases in cryogenic pumps during sudden warm-up?
