Live Quiz Arena
🎁 1 Free Round Daily
⚡ Enter ArenaQuestion
← TechnologyWhich risk increases when watchdog timers fail in PLCs controlling automated crane systems?
A)Uncontrolled load swing develops✓
B)Reduced data-logging resolution occurs
C)Communication bandwidth becomes saturated
D)Encoder synchronization lags severely
💡 Explanation
An uncontrolled load swing develops because, without the watchdog timer, the PLC might freeze due to electrical noise. The crane's controlled movements cease, and the unbraked load oscillates violently under gravity's influence; therefore the answer is uncontrolled load swing, rather than safe halting, under faulty conditions.
🏆 Up to £1,000 monthly prize pool
Ready for the live challenge? Join the next global round now.
*Terms apply. Skill-based competition.
Related Questions
Browse Technology →- Which outcome occurs when a collaborative robot's (cobot) force sensor exhibits excessive drift?
- Which outcome occurs when increased surface roughness causes path obstruction on a phased array antenna?
- Which risk increases when a gallium arsenide (GaAs) semiconductor laser's pulsed operation frequency rises excessively, approaching material limits?
- Which inefficiency arises when increasing CMOS inverter frequency?
- Which performance benefit primarily results when post-tensioning high-strength concrete beams?
- Which instability arises when a high-gain PID controller overcompensates within a chemical reactor's temperature regulation loop?
