← TechnologyWhich risk significantly increases during the post-tensioning process of a concrete bridge deck when grout density is insufficient?
A)Cable corrosion due to moisture ingress✓
B)Concrete cracking from uneven stress
C)Reduced deck stiffness under load
D)Increased creep deformation over time
💡 Explanation
When grout density is insufficient, incomplete filling of the duct occurs, increasing the risk of cable corrosion because it allows moisture ingress, leading to oxidation of the steel strands. Therefore, cable corrosion results, rather than cracking, reduced stiffness or increased creep, requiring alternative mechanisms related to concrete matrix and overall structure.
🏆 Up to £1,000 monthly prize pool
Ready for the live challenge? Join the next global round now.
*Terms apply. Skill-based competition.
Related Questions
Browse Technology →- In phased array radar, which mechanism causes grating lobe formation?
- Which consequence results when aircraft automatic landing systems experience excessive radio interference during final approach?
- Which risk increases when stratified charge fuel injection is continuously disabled in a lean-burn engine?
- Which failure mode occurs when a refrigerant leak exposes a hermetic compressor motor windings to excessive moisture?
- Which mechanism limits precision during silicon wafer surface grinding?
- Which outcome occurs when fuel sulfur content exceeds fuel catalyst limits in a selective catalytic reduction (SCR) system?