Live Quiz Arena
🎁 1 Free Round Daily
⚡ Enter ArenaQuestion
← HistoryWhich structural outcome faced by early ziggurats resulted from differential settlement?
A)Ramp collapse over internal passages
B)Foundation tilting and wall cracking✓
C)Erosion amplifying rain runoff
D)Mud brick fusion near kilns
💡 Explanation
Foundation tilting and wall cracking developed in early Ziggurats as differential settlement occurred; the varying compactness of the underlying soil leads to uneven support of the structure because consolidation occurred non-uniformly; therefore, the structure experiences deformation, rather than remaining intact.
🏆 Up to £1,000 monthly prize pool
Ready for the live challenge? Join the next global round now.
*Terms apply. Skill-based competition.
Related Questions
Browse History →- Which unintended siege consequence occurred due to concentric castle design?
- Which long-term structural risk increased in Gothic cathedrals when masons utilized thin, lightweight stones?
- Which outcome increases if zenith angle inaccuracy increases when aligning historical Islamic astrolabes?
- Which risk critically increases when Inca stone masonry walls experience prolonged ground settlement?
- Which outcome accelerated Roman ballista projectile velocity by torsion spring development?
- Which outcome limited the expansion of terrace farming by Andean civilizations despite its agricultural benefits?
