Live Quiz Arena
🎁 1 Free Round Daily
⚡ Enter ArenaQuestion
← TechnologyWhich risk sharply increases during concrete bridge construction if prestressing cable tension rate exceeds design limits?
A)Excessive concrete spalling or cracking✓
B)Increased cable fretting fatigue risk
C)Reduced long-term creep relaxation
D)Accelerated rebar corrosion vulnerability
💡 Explanation
Excessive cable tension causes concrete spalling because the mechanism of exceeding compressive stress capacity leads to surface fracturing, therefore cracks originate and propagate rather than uniform compression; this is worse with rapid tension.
🏆 Up to £1,000 monthly prize pool
Ready for the live challenge? Join the next global round now.
*Terms apply. Skill-based competition.
Related Questions
Browse Technology →- Which risk increases when autonomous drone flight controls ignore sensor data during GPS interference?
- Which risk increases when an internal combustion engine's turbocharger wastegate malfunctions in a cold climate?
- Which outcome occurs when increased reactive power loads cause a voltage collapse in a power grid?
- Which risk is most increased as welding near quenched steel beam joints cools?
- Which limitation is imposed inside refrigeration scroll compressors exhibiting extensive vapor re-expansion?
- In a precision hydraulic actuator, which consequence results when the proportional control valve experiences excessive deadband?
