Which unstable outcome will likely occur from unsynchronized large power grid connections?

A)Cascading transmission line overload
B)Rapid frequency stabilization network-wide
C)Distributed generation capacity enhancements
D)Improved reactive supply compensation factors

💡 Explanation

Connection attempts cause a reactive power surge through the system because phase angle differences drive oscillatory power flow, leading to a cascading overload. Therefore grid instability occurs, rather than frequency settling directly or planned DG implementation, under these faulty condition settings.